Fmaster_2

Statewide Marking Guidelines
for Facility Owners                         
Download Guidelines Condensed Version Watch Video

The following Statewide Marking Guidelines may be used by member facility owners

 MARKING SAMPLES
(Company names used below are for illustrative purposes only.)

LINE

 
.wAny single facility less than 12" in diameter.
wSingle conduit
 

CORRIDOR

 
wUsed when multiple facilities cannot be specifically delineated.  Mark should represent located outside edges and number of facilities whenever possible. 
 

OVERSIZED

 
wAny facility 12" or greater.  Marks should represent outside edges of facility. 
 

DUCT PACKAGE

 
wMarks should represent outside edges of facility whenever possible.
 

HIGH PRESSURE GAS LINES

 
wCompany should indicate that the line is high pressure gas. 
 

TERMINATION POINT

 

 
 

OFFSETS

 
wUsed when marks cannot be placed directly above buried facility. 
 

NO CONFLICT

 

NO/COMED

wRecommend company name with the word NO 

wRecommend company name with the word NO

NICOR/OK

 

BURIED SPLICES, VALVES, MANHOLE LIDS

 
wCircle should represent approximate size of buried facility
 

STREET LIGHTS

 

 

TRAFFIC CONTROL