Home » Agricultural Community
On the farm, excavation is a way of life, and accidents involving underground utility lines occur daily. Projects such as tile plowing, deep ripping, sub-soiling, and setting posts in particular can create safety hazards if you don’t know where critical underground utility lines like rural water, fiber optic, electric, pipeline, and high-pressure gas distribution systems are located on your property. Keep safety top of mind by always contacting JULIE before you dig to verify the location and depth of underground utility lines. It’s FREE, easy, quick, and can save your life.
Pre-mark the dig site with white paint, flags or stakes.
Available 24/7/365:
JULIEBeforeYouDig.com
Call 811 or 800-892-0123
Utility companies must mark their underground lines and post their responses to JULIE’s Positive Response system by the date and time on your locate request. When all responses are in, you’ll know that your property has been marked or cleared and whether it’s legal to dig.
Don’t remove flags, stakes or paint marks until your project is finished.
Understand the tolerance zone.
Underground utility lines can be located 12 inches or less below the surface and depth can change over time due to erosion, land use, subsoil activities, land contouring, and other factors. So never assume the location or depth of underground utility lines. Striking just one can result in injury to yourself or others, cost you time and repair charges, and cause tremendous property and environmental damage that can impact your family for generations. Protect your land and your legacy by contacting JULIE to have underground utility lines marked for free. Every project. Every time.
Learn about JULIE’s innovative NEW ticketing system.